6 Lines of the north trunk line irrigation channel
» Location |
Tainan |
» Type |
Grid-Tie |
» Capacity |
3276 kWp |
» Completed |
2021 |
Encouraging take up of renewable energy
The Chianan Management Office of the Irrigation Agency planed and established the solar farm above and on both sides of 6 lines of the North trunk line irrigation channel without the interference of its irrigation function. The agricultural land usage allowance was gained in the process of establishment. With the establishment of solar farm, the idle land on both sides of the channel banks is fully utilized.
Sources of information:Hengs Technology Corp. Ltd.